SCHEDULE OF TECHNICAL REQUIREMENTS (STR) FOR FABRICATION OF OPEN WEB, BOW STRING, COMPOSITE AND OTHER STEEL PLATE GIRDERS
Quality Assurance Aspect
-
System for testing of raw material to ensure that it conforms to relevant specification should exist. The traceability of material should be there.
-
All equipment must meet the requirements of relevant BIS or other international specifications. It will be fabricator’s responsibility to satisfy the inspecting engineer that all the equipment/accessories conform to BIS or any other standard in absence of marking on such equipment/accessories. All these equipment/accessories will be subjected to periodic tests and records maintained. System of periodic maintenance of M&P must be in vogue and proper record maintained.
-
There shall be a system to ensure the traceability of the product from raw material stage to finished stage.
-
Firm should have Quality Assurance Plan (QAP as per latest ISO apex document) for the product manufactured by them detailing various aspect –
-
Organization chart
-
Flow inspection details
-
Stage inspection details
-
Control measures for various parameters for ensuring quality.
Quality Audit
-
he firm should satisfy the following requirements to continue as approved vendor:
-
The firm must continue to maintain the infrastructure, facilities and Machineries & Plants as required at the time of Quality Audit as per prevailing STR.
-
The firm must have executed/completed at least one work of Railway Bridge girder Fabrication since registration or previous quality audit. For the purpose of this clause, fabrication of at least one span against a multiple span bridge will be considered/ treated as completed work. The firm shall provide the Inspection/Passing certificate by RDSO/Railway’s Fabrication Inspection Unit (FIU) /authorised Third Party Inspection (TPI) Agencies as applicable.
-
The firm shall not have any adverse report from any of the Railways.
-
For Quality Audit, firm will be inspected and verified for facilities provided under Para 4 to 6 of this STR by RDSO team. The firm shall also give an undertaking that organizational and infrastructural
-
requirement as required at the time of Quality Audit have been maintained.
-
If the firm does not satisfy the criteria given in Para 7.2 & 7.3 above, it will be delisted from approved list and firm shall have to apply afresh in case it desires to be registered again.
Vendor Approval RDSO
Item/Tab | Information/Sub-tab | Information/Sub-tab |
|---|---|---|
Ownership details | Ownership Board of Director, Partners Registration / incorporation details, Memorandum and Article of association/ partnership deed/LLP agreement Registered address Contact information | Mr. Anil Mendhe (Director) Mr. Siddharth Mendhe (Director) CIN No. -U45209MH2021PTC. . Sunny Tower, Khat Rd, Ramayan Nagari, Bhandara, Maharashtra, India, 441904 As per attached MOA. |
Fabrication Units (for each unit) | ISO Certification | • Certifying body:- ICV ASSESSMENTS PVT. LTD. • Date of certification :-30/01/2025 • Last date of surveillance audit :-10/12/2024 • Last date of internal audit with details of compliances :- 12/11/2024 |
Fabrication Units (for each unit) | Factory license | 12050251120000E |
Fabrication Units (for each unit) | MSME registration/ ROC registration | UDYAM-MH-06-0005193 |
Fabrication Units (for each unit) | Details of RDSO approval (Item Name & Item No. for which approved) | • Registration ID :- 13413 • Annual Production capacity:-10000 • Last quality audit done on:-30/06/2022 • Next quality audit due on :30/06/2027 |
Fabrication Units (for each unit) | Facilities including details of Machinery & Plants as applicable (Brief description and photographs) | • Template layout area • Fabrication shop- Cutting, Drilling, Welding, Straightening, End milling • Blasting shop • Metalizing & Painting shop • Assembly area • Stacking area • Any other facility/area/shop |
Fabrication Units
(for each unit) | Address | 14th Mile, Chinchbhuwan, Nr. Nagpur-Amravati Highway, Kalmeshwar Rd Logistic Park, Tq. Kalmeshwar, Dist. Nagpur, Maharashtra - 4415 |
RESPONSIBILITY AND AUTHORITY:
Activity | Responsible | Approver | Supporting | Consulted | Informed |
|---|---|---|---|---|---|
Creation, maintenance of this document. | EDBS | PED/Infra- II | Directorate Officials | -- | Through intranet/ RDSO’s
public website |
Compliance of Directive contained in this documet | EDBS | PED/Infra- II | Directorate Officials | -- | -- |
AVAILABLE FACILITIES